Illinois College Facilities Management

 
 

Project Number
Project Descriptions

Status

04-001

College Walkways

Complete

04-002

Baxter Hall Renovation

Complete

04-003

Turner Hall Lobby Renovation

Complete

04-004

Campus Interior Lighting Replacement

Complete

 
Project Number

Project Descriptions

Status

05-001

New Residence Hall

Complete

05-002

New Apartment Building

Hold

05-003

Whipple Hall Renovation

Design

05-004

Cummings Dining Hall Renovation

Complete

05-005

Tanner Hall Renovation ADA

Hold

05-006

Multi Purpose Field and Track Project

Close-Out

05-007

Turner Hall Renovation

Complete

05-008

Various Residence Hall Upgrades (Turner Hall)

Complete

05-010

Beecher Hall Roof Replacement

Complete

05-011

Barnes House Pillar Replacement

Complete

 
Project Number

Project Description

Status

07-001

Annual Campus Painting and Sidewalks

Complete

07-002

1059 West College Roof Replacement

Complete

07-003

1063 West College Roof Replacement

Complete

07-004

Octagon House Garage Roof Replacement

Complete

07-005

Crispin Hall Roof Replacement

Complete

07-006

Cummings Dining Hall Kitchen Equipment

Complete

07-007

Campus Flooring (Green Hall)

Complete

07-008

Replace Ellis Hall Restroom Fans

Complete

07-009

Campus Wide Asbestos Survey

Complete

07-010

Fire Alarm Upgrades

Complete

07-011

Relocate Mail Room/Student Lounge

Complete

07-012

Kirby Room 236 (209) Office Remodel

Complete

07-013

Schewe Library

Hold

07-014

Gardner/Mundinger Study Room Furniture

Complete

07-015

Campus Wide ADA Survey

Complete

07-016

Rammelkamp Chapel Window Shades

Complete

07-017

Campus CO Detectors

Complete

 
Project Number

Project Description

Status

08-001

Crampton Hall Renovations

Design

08-002

Pixley Hall Sprinkler Upgrades

Complete

08-003

Cummings Kitchen Upgrades

Hold

08-004

Cummings/Caine Partial Roof Replacement

Close-Out

08-005

Campus Painting and Sidewalks

Complete

08-006

Campus Flooring Replacement

Complete

08-007

College Apartment Repairs

Complete

08-008

Fayerweather Roof Replacement

Complete

08-009

Greene Hall CO Detectors

Complete

08-010

Parker Hall HVAC Control Replacement

Complete

08-011

McGaw Lighting

Complete

08-012

Softball Field Project

Complete

08-013

Pixley and Ellis Furniture Upgrages

Complete

08-014

Smith House Reglaze Windows

Complete

08-015

Bruner Center Condenser Water System Cleaning

Complete

08-016

German House Partial Porch Replacement

Complete

08-017

New Mass Notification System

Complete

08-018

1005 Edgehill Fire Alarm

Complete

08-019

Memorial Gym- Old Mail Room Floor Work

Complete

08-020

Storm Damage

Complete

08-021

Schewe Library Patio Renovation

Design

08-022

Baxter Hall Animal Laboratory

Construction

 
Project Number

Project Description

Status

09-001

Annual Painting

Construction

09-002

Annual Flooring

Construction

09-003

Annual Paving

Construction

09-004

1063 West College

Construction

09-005

Chapel Ramp

Design

09-006

Pixley Roof Replacement

Construction

09-007

Schewe Partial Roof Replacement

Complete

09-008

Barnes House Roof Work

Constrcution

09-009

Fayerweather Chimney

Complete

09-010

Fayerweather Foundation

Complete

09-011

1059 West College Porch Repair

Complete

09-012

Physical Plant Building 2nd Level Rail

Complete

09-013

College Ave. Apts. Window Work

Construction

09-014

Gardner and Greene Exterior Doors

Bidding

09-015

Tanner Hall HVAC Piping Repairs

Bidding

09-016

Gardner & Ellis Window Coverings

Bidding

09-017

College Ave. Apts. Window Work

Complete

09-018

Cummings Walk-In Cooler

Design

09-019

New Lawn Tractor

Bidding

09-020

Pixley Lounges, etc.

Construction

09-021

Older Res. Hall-Clean Up

Bidding

09-022

Baseball Field Grading

Bidding

09-023

Equipment Storage Lockers-All Sports

Bidding

09-024

Used Utility Vehicle

Complete

09-025

Memorial Garden

Complete

09-026

Admissions Office Furniture

Complete

09-027

Advancement Furniture

Complete

09-028

Repair Concrete Steps between Gardner Hall & Memorial Gym

Preconstruction

09-029

1063 A/C Electrical Work

Complete

09-030

Greene Hall Roof Repair

Construction

09-031

Octagon House-Porch, Safety Repair Work

Construction

09-032

Octagon House-Structural Foundation Work

Construction

09-033

Octagon House-Drain Tile

Construction

09-034

Octagon House-Partial Roof/Replacement

Construction

09-035

Octagon House-Exterior Moisture Proofing

Construction

09-036

Octagon House-Entrance Conreter (For New Parking Lot)

Construction

09-037

Beecher Hall-Window Restoration

Funding

09-038

College Ave. Apts.-Apt. #17 Warped Floor Due to Plumbing

Construction

09-039

Crsipin Hall-Asbestos Abatement

Complete

09-040

Shot-Put & Discuss Pad-Hougland St.

Construction

09-041

Control Retrofit for Bruner

Bidding

09-042

Business Office Furniture & Equipment

Bidding

 
 
 
 