Summer Projects 2012 |
 |
|
 |
|
|
The IT staff was hard at work over the summer. It is one of our busiest times of the year. Below is a list of some of the projects that we completed during the summer of 2012.
- Replace almost all switches on campus with Meraki gigabit switches, cleaning up network closets and installing new 5 ft. cat6 patch cables as we go.
- Replace all 230 Cisco access points with Meraki access points. (indoor and outdoor)
- After facilities moves old switch rack from Tanner basement to Baxter, Rack all servers and SAN parts that are currently stacked in the floor.
- Install new Revinetix backup system and get all server backup jobs transferred to it and working.
- Identify all teaching and presentation machines and upgrade them to 4GB of Ram and Windows 7. This includes the presentation laptops in Education as well.
- Run T:\DeleteProfiles\New Delprof\delprof2.exe to cleanly remove all profiles from all Kirby 244 Lab machines, all education lab machines (including laptops), all terminal server lab machines, and all library machines.
- Transition students from student common to Google Drive, and push Google Drive client out to all IC computers.
- Reconfigure Lincoln networking so fiber lines go directly to each of the 6 closets instead of a distribution switch.
- Optimize Spiceworks and get the Meraki software set up on all new switches. This may be a good replacement for Orion NPM.
- Finish networking and new servers for Cummings dining hall (CBORD project).
- Upgrade all faculty and staff who respond to Windows 7.
- Replace 60 faculty and staff computers with new ones, ensuring that all their data is backed up and restored correctly.
- Intergration of Connect2/Moodle
- Replaced all batteries in Baxter network core UPS system to maintain optimal uptime during any power outages
- Installed dual projectors and screens, podium, ceiling speakers, DVD, Crestron controls in Parker 107
- Added smart cart w/VCR, DVD, PC and bluetooth keyboard with integrated touchpad in Parker Conference Room
-
Installed projector, podium, ceiling mounted speakers,VCR, DVD, screen,
Extron Control in Kirby 108
-
Added Smartboard w/ DVD,VCR and PC and bluetooth keyboard and bluetooth keyboard
to Crispin 107
|
|
 |
|
|
|